OBJECTIVES
- Define the scope of equipment requiring material handling considerations
- Define general methodology for local removal / maintenance of equipment
- Define general methodology for transferring equipment / components within the Facility, encompassing access route and laydown area considerations
- Define general methodology for transferring equipment / components from the Facility to and from the supply boats
- To identify all fixed and portable / temporary handling devices required on the platform
ACTIVITY CONSIDERED
- Installation, Commissioning, and Startup
- Operation and Preventative Maintenance
- Inspection Cleaning in Place
- Disassembly for Maintenance or Removal
- Removal and Replacement
HUMAN FACTORS TO CONSIDER
- Mobile / pedestal cranes
- Jacking system, lifting lugs, beam clamps, and removable manual chain block for vertical lift and direct transfer on trolley or forklift.
- Permanent monorails for heavy loads
- Mobile handling devices with suitable accessibility
